AIG - AI Manager

Current Version: 0.8.2.0
IMPORTANT: Version 0.7 will no longer support FS9

Current features:
  • Identify local flightplans
  • Check online for updated flightplans
  • Check online for defunct airlines
  • Delete flight plan and fltsim entires as well as textures
  • View detailed information of airlines and airports
  • Visual parking usage at airport (disabled since 0.6.1)
  • Find missing airports
  • Find double registrations
  • Renameing files
  • Find duplicates of airlines
  • Find a registration
  • Edit Fltsim entries
  • Find faulty fltsim entries
  • Find unused fltsim entries
  • Download and install flightplans/repaints
  • support of reading and compiling multi-week rotations
  • Full P3Dv4 support
« Last Edit: December 15, 2018, 03:33:08 PM by Kaiii3 »

Offline Kaiii3

  • AIG Technic
  • Command Captain
  • *****
  • Posts: 3918
    • Kai's AFD Studio
Re: AIG Software - AI Manager
« Reply #1 on: November 29, 2016, 08:08:36 PM »
Development Preview: 29.11.2016

All preview pictures are development shots, the final product may be different from the shown pictures



The main window proves a list of all installed flightplans and after checking online outdated plans will be marked yellow and a list of newer flight plans is displayed. If a flight plan is marked red the airline is defunct.



A detailed view of a installed flight plan is provided, listing each aircraft and each registration and a map of the routes




Based on the information of the bgl a GanttChart is created to display each flight of a registration



For each airport a list is created of all airlines operation to and from this airport and their routes, selecting one will show you a map with only routes of this airline.




Based on the stock airports or add-on airports a visual parking map of the airport will be created and information about the parking usage will be provided



And here a information about the time that the tool needs to collect all the information:
On my current system (ca. 473 flightplans) the time to collect the local files take about 10 seconds, the online check (AIG File Area and AIG Forum) about 30 seconds and the check for defunct airlines about 30 seconds. After that there are no more loading times between switching airports, airlines.

Offline hgschnell

  • Turbine 2nd Officer
  • ***
  • Posts: 174
Re: AIG Software - AI Manager
« Reply #2 on: November 29, 2016, 08:33:52 PM »
Looks great!

Is FS9 in your project?

Offline Ed4planes

  • Turbine 1st Officer
  • ****
  • Posts: 324
Re: AIG Software - AI Manager
« Reply #3 on: November 29, 2016, 09:39:57 PM »
This looks very very awesome

ED

Offline Holy Cheese

  • Turbine 2nd Officer
  • ***
  • Posts: 206
Re: AIG Software - AI Manager
« Reply #4 on: November 29, 2016, 09:54:26 PM »
Wow - looks fantastic, very very useful!  ::thumbsup::

Thanks
Jack

Offline juanvito

  • Turbine 2nd Officer
  • ***
  • Posts: 151
Re: AIG Software - AI Manager
« Reply #5 on: November 29, 2016, 10:05:30 PM »
This looks great!

Will it work with non-AIG flightplans?

Offline johanfrc

  • Administrator
  • Command Captain
  • *******
  • Posts: 18983
    • JCAI
Re: AIG Software - AI Manager
« Reply #6 on: November 29, 2016, 10:17:31 PM »
Looking at the plans mentioned in the program it says both RBT and UTT. RBT is the old "Real Big Tree" which Ben Clark had some years ago.
Regards

Johan Clausen

Offline NorthSky

  • Turbine 1st Officer
  • ****
  • Posts: 363
    • Jetset Shirts
Re: AIG Software - AI Manager
« Reply #7 on: November 30, 2016, 02:57:45 AM »
Fantastic! Very much looking forward to this!

Offline Kaiii3

  • AIG Technic
  • Command Captain
  • *****
  • Posts: 3918
    • Kai's AFD Studio
Re: AIG Software - AI Manager
« Reply #8 on: November 30, 2016, 06:24:37 AM »
Is FS9 in your project?

FS9 is integrated, but not really tested yet

Will it work with non-AIG flightplans?

As Johan said yes, there are some specific algorithms for AIG, UTT, JCAI, KPK, etc. and one generic that can identify almost every flightplan on the local system. During the online checkare currently only AIG, KPK, JCAI and ACFP will be detected at the moment, but more to come

Offline mgwrr1

  • Prop 1st Officer
  • *
  • Posts: 26
Re: AIG Software - AI Manager
« Reply #9 on: November 30, 2016, 05:02:10 PM »
This Program looks absolutely fantastic ::thumbsup::

Offline Anthony Fokker

  • Turbine 1st Officer
  • ****
  • Posts: 379
Re: AIG Software - AI Manager
« Reply #10 on: November 30, 2016, 05:24:25 PM »
This looks incredible! Really Fantastic.

Anthony

Offline Bvsawh

  • Turbine 1st Officer
  • ****
  • Posts: 404
Re: AIG Software - AI Manager
« Reply #11 on: November 30, 2016, 05:40:39 PM »
Looks awesome

Offline BMW007

  • Prop 1st Officer
  • *
  • Posts: 19
Re: AIG Software - AI Manager
« Reply #12 on: November 30, 2016, 05:58:55 PM »
This is really REALLY great!

A few questions..
1. Does this program link directly to AIG, or will we still have to download the files and put them in a folder somewhere?
2. Will this install aircraft and liveries as well, or will we have to point it in the right direction to files already loaded?
3. For those of us who have painstakingly arranged years and years of AI plans into a file with thousands of entries, will this program recognize the arrangement or will it be easier to start from scratch?
4. Does the Airport tool just give information, or is there a way to have it interact with ADE files to change parking assignments?
5. Did I mention this is really REALLY great?

Thank you to all who have been working on this ::thumbsup::

Offline Kaiii3

  • AIG Technic
  • Command Captain
  • *****
  • Posts: 3918
    • Kai's AFD Studio
Re: AIG Software - AI Manager
« Reply #13 on: November 30, 2016, 07:02:57 PM »
This is really REALLY great!

A few questions..
1. Does this program link directly to AIG, or will we still have to download the files and put them in a folder somewhere?
2. Will this install aircraft and liveries as well, or will we have to point it in the right direction to files already loaded?
3. For those of us who have painstakingly arranged years and years of AI plans into a file with thousands of entries, will this program recognize the arrangement or will it be easier to start from scratch?
4. Does the Airport tool just give information, or is there a way to have it interact with ADE files to change parking assignments?
5. Did I mention this is really REALLY great?

Thank you to all who have been working on this ::thumbsup::

1: direct download
2: no, to install them you need to run AIFP
3: The tool will almost deteced everything automaticly
4: Only displying information

Offline sardanapal

  • Prop 1st Officer
  • *
  • Posts: 38
Re: AIG Software - AI Manager
« Reply #14 on: November 30, 2016, 07:09:48 PM »
Hi,